INSP-Final Inspection | 5/17/2018 | 5/22/2018 | 5/22/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 2/20/2018 | 2/23/2018 | 2/23/2018 | A | FAIL |
Troy Cobbley
|
|
|
The outside electric alarm bell can be silenced from the FACP which is not allowed. All other items appear ok.
Natalie Phone #: ###-####
|
INSP-Final Inspection | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for final yet. Today we tested the additional strobe in the short corridor that was added. Hvac unit would not shut down upon activation of the smoke detector.
John Lopez Phone #: ###-####
|
INSP-Final Inspection | 9/1/2017 | 9/1/2017 | 9/1/2017 | P | CANC |
Troy Cobbley
|
|
|
John Phone #: ###-####
|
INSP-Final Inspection | 8/18/2017 | 8/22/2017 | 8/22/2017 | P | FAIL |
Troy Cobbley
|
|
|
Need as-builts addressing the device locations and candella changes, hvac unit needs wired for shutdown, need map, need notification in short corridor, need flow switch tested.. All other devices tested
|
INSP-Conference | 12/6/2016 | 12/6/2016 | 12/6/2016 | P | DONE |
Scott Arellano
|
|
|
Onsite visit to check on progress and meet with owner. Construction work remains in progress. Advised owners representatives to have fire protection contractors call in for testing and inspection of completed systems for partial completion.
|
INSP-Conference | 12/2/2016 | 12/2/2016 | 12/2/2016 | A | DONE |
Troy Cobbley
|
|
|
I contacted John via email and he is going to follow up with the church and get back to me.
|
INSP-Final Inspection | 9/8/2015 | 9/10/2015 | 9/10/2015 | P | CANC |
Troy Cobbley
|
|
|
Cancel per John Phone #: ###-####
|
INSP-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for building area where I tested today. Some corrections have been noted. Not all construction is complete or fire alarm installed.
|
INSP-Final Inspection | 8/13/2015 | 8/18/2015 | 8/18/2015 | A | FAIL |
Katie Marron
|
|
|
No City approved drawings or submittals were on site. Inspection to be rescheduled.
|
INSP-Final Inspection | 7/7/2015 | 7/9/2015 | 7/9/2015 | P | CANC |
Troy Cobbley
|
|
|
John Phone #: ###-####
|