INSP-Final Inspection | 9/23/2015 | 9/24/2015 | 9/23/2015 | A | PASS |
Thomas Walsh
|
|
|
Test of fire alarm system interface with egress hardware (mag locks) to ensure proper functioning - PASSED. NOTE: Fire alarm system testing passed final inspection. As this is a network system, the new address for this building will have to be upgraded to ensure that emergency crews get the correct information from dispatch.
|
INSP-Final Inspection | 9/15/2015 | 9/21/2015 | 9/21/2015 | P | PART |
Thomas Walsh
|
|
|
Fire alarm test of all fire sprinkler and hood and duct FP systems interface, SDs, MPs, HVAC DDs, SFDs, notification devices, etc. All tested OK. NOTE: FA interface to egress door hardware (mag. locks) not tested - not ready.
|