INSP-Final Inspection | 6/1/2015 | 6/2/2015 | 6/3/2015 | P | PASS |
Thomas Walsh
|
|
|
Completion of 24 hour air test of dry pipe valve (PASSED) and trip test of the DP valve, which flowed full pressure at the inspectors test valve in 80 seconds after DPV activation. Fire alarm interface not tested this visit.
|
INSP-Sprinkler Rough-in | 6/1/2015 | 6/1/2015 | 6/1/2015 | P | PART |
Thomas Walsh
|
|
|
24 hour air test - 40 psi at 1330 hrs.
|
INSP-Sprinkler Rough-in/Hydro | 6/1/2015 | 6/2/2015 | 6/1/2015 | P | CANC |
Thomas Walsh
|
|
|
trip test Please call Leroy 30 min prior ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in/Hydro | 5/21/2015 | 5/21/2015 | 5/21/2015 | P | PASS |
Thomas Walsh
|
|
|
Bldg. D dry pipe system hydrotest - 200psi @ 2 hours - Passed
|
INSP-Sprinkler Rough-in/Hydro | 4/14/2015 | 4/14/2015 | 4/14/2015 | P | PART |
Katie Marron
|
|
|
Area D Porte Cochere dry system ok to cover per plans. Entry vestibule was not complete at this time.
|
INSP-Sprinkler Rough-in | 4/13/2015 | 4/14/2015 | 4/14/2015 | A | CANC |
Katie Marron
|
|
|
Rough in Porte Cochere - Dry Please contact Leroy 30 min prior ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in | 1/20/2015 | 1/21/2015 | 1/21/2015 | A | PART |
Forrest France
|
|
|
Work completed to date on area D dry system inspected to plan modification drawings. Install at the porte cochere is unfinished at this time.
|
INSP-Sprinkler Rough-in | 12/8/2014 | 12/9/2014 | 12/9/2014 | P | FAIL |
Forrest France
|
|
|
Numerous field modifications to main, and branchline routing, deleted and added heads including branchlines at several locations, major elevation changes not indicated, changes to types of heads installed at specific areas- Need to provide a resubmittal prior to rough-in and cover inspection approval. Some areas incomplete, missing sprinklers, two eves are not covered.
|
INSP-Sprinkler Rough-in | 11/26/2014 | 12/1/2014 | 12/9/2014 | P | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 11/19/2014 | 11/20/2014 | 11/20/2014 | A | FAIL |
Troy Cobbley
|
|
|
This was for Bldg D dry system. Heads overspaced, additional fittings and heads blocked by obstructions. Plans need to be resubmitted that match the actual layout. No piping to be covered. Only inspected area at remote area. Did not look at hangers, bracing or restraints.
|
INSP-Sprinkler Rough-in | 11/18/2014 | 11/18/2014 | 11/19/2014 | P | NR |
Forrest France
|
|
|
Missing stamped approved plans on site.
|
INSP-Sprinkler Rough-in | 11/24/2014 | 11/25/2014 | | A | |
Forrest France
|
|
|
RTC for Dry System, Bldg D 1st floor, please call Scott 30 minutes prior at ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt
|