INSP-Final Inspection | 7/29/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | FAIL |
Troy Cobbley
|
|
|
No access to room because of flooring and many of the sprinkler heads still had protection on them by painters. No inspection completed.
|
INSP-Conference | 7/1/2015 | 7/1/2015 | 7/1/2015 | P | DONE |
Troy Cobbley
|
|
|
Rick and I met to discuss sprinkler obstructions. I deferred him to plan review.
|
INSP-Sprinkler Rough-in | 6/26/2015 | 6/26/2015 | 6/26/2015 | P | PART |
Jim Page
|
|
|
Contractor re-configured head placement in growth chambers,east side of building first floor, instead of 4 pendants contractor changed to two sidewalls, coverage works with application. Contractor will notate on as-build drawings the change in head lauout.
|
INSP-Sprinkler Rough-in | 5/20/2015 | 5/21/2015 | 5/21/2015 | A | PASS |
Troy Cobbley
|
|
|
Second floor rough-in passed. As-builts will be required for pipe routing changes and head additions.
|
INSP-Sprinkler Rough-in/Hydro | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | PASS |
Troy Cobbley
|
|
|
1st floor overhead hydro passed
|
INSP-Sprinkler Rough-in | 5/14/2015 | 5/15/2015 | 5/15/2015 | A | PART |
Troy Cobbley
|
|
|
First floor rough-in passed. Need to address combustible concealed space at entrance. Hydro test failed. Second floor lobby area rough-in passed. Head in bottom of elevator shaft passed.
|
INSP-Sprinkler Rough-in/Hydro | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | PART |
Katie Marron
|
|
|
Four hard lid areas on second floor ok to cover.
|