Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR14-00839
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1600 W GOWEN RD
Project NameSKYWEST MAINTENANCE HANGAR
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of a new 132,770 building. Group I hangar, office and warehouse space. All to be fully protected by 189,000 gallon NFPA 22 water storage tank, two 3000 Gpm @150 psi diesel fire pumps in parallel and one back up 3000 Gpm @150 psi electric fire pump. There will be three wet systems, three 2% high expansion foam generator systems, and one 3% AFFF hose system..

The hangar is protected with an automatic sprinkler system and a 2% low level high expansion foam system with AFFF hose stations. The high expansion foam is based on local application for duration of 12 minutes

NOTE: The type of high piled storage in the parts area is not defined. The system is therefore, designed based on BMC 7-01-53. Before any actual occupancy or storage can take place, a resubmittal is required describing the actual type of storage and storage configuration.

The underground is under permit FIR14-00783

(SKYWEST MAINTENANCE HANGAR – Cold Shell Permit) This permit is to construct the exterior shell and associated foundation to a new 132,770 square feet Maintenance Hangar. Grading, drainage and Utilities approved under BLD14-02396. All work per approved plans and attached engineering. Scope of work includes: construction of new foundation, construction of pre-manufactured steel building, exterior doors, exterior windows, one-hour fire separation between hangar and future office/assembly/work area, all exterior envelope compliance, installation of new loading dock and equipment, and exterior finishes.

At this time the TI has not been submitted
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/20/20158/21/20158/21/2015APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Final Inspection8/14/20158/14/20158/14/2015PCANC
DetailsJim Page
Spoke with POC over the phone, Mike Phone #: ###-####, Simplex still needs to install pull stations for foam system avtivation, cannot final until pulls stations are installed and tested for actuation.
INSP-Sprinkler Rough-in8/12/20158/12/20158/12/2015PPASS
DetailsTroy Cobbley
Todays inspection was for flow verification of the foam system. This verification failed. See the plan reviewer attached notes on the specificsof what was witnessed

______________________________________
Below add by Plan Reviewer TRF

Based on the following the foam test PASSED.

NFPA 409 6.1.1 (3)
NFPA 409 6.2.5.3 (withing 5' in 3 minutes)
NFPA 409 6.2.5.5.1 (local application, NFPA 11)
NFPA 11 6.13.3.3.1 (2 ft within 2 min)
The requiment of 2' of foam was met in 1:50 seconds.



INSP-Sprinkler Rough-in8/11/20158/11/20158/11/2015PDONE
DetailsTroy Cobbley
Boise Fire Dept. witnessed the flowing water at the foam generators. Forrest France verified required pressure at foam generator.
INSP-Sprinkler Rough-in/Hydro8/6/20158/7/20158/7/2015APASS
DetailsTroy Cobbley
Overhead hydro tests of the four foam systems (DDX valves) passed.
INSP-Supply line flush8/5/20158/6/20158/6/2015ACANC
DetailsTroy Cobbley
Mike Phone #: ###-####
INSP-Conference8/4/20158/5/20158/5/2015ADONE
DetailsTroy Cobbley
Todays inspection was for certification of the 3 fire pumps. Inspection passed. We found that all three pumps are 3psi to 7psi above on Churn. Both diesel pumps are 4psi to 5psi low at 150%. After conferencing with Tim Frost and Gary with Tolco pumps that this is still acceptable. We actually moved the guages and gained acouple of psi.
INSP-Sprinkler Rough-in6/30/20157/1/20157/1/2015APASS
DetailsTroy Cobbley
The remaining underground supply piping for the test header is ok for cover. Ball drip has been installed in vault.
INSP-Sprinkler Rough-in/Hydro6/24/20156/24/20156/24/2015PPASS
DetailsTroy Cobbley
Todays inspection was for the hanger area. Rough-in passed. Mike is going to provide verifircation that the two tech screws used for the 2" branchline hanger is approved. I need to verify that hanger clips are not required (data sheet provided with submittal)
INSP-Sprinkler Rough-in/Hydro6/15/20156/15/20156/15/2015PPASS
DetailsJim Page
Hydrostatic test complete on the three wet systems
INSP-Sprinkler Rough-in6/5/20156/5/20156/5/2015PPASS
DetailsKatie Marron
Rough-in of grid ceiling areas OK to cover. One sprinkler head overspaced in front office (south west of main door). Needs to be adjusted left to the adjacent 2x2 grid per drawing..
INSP-Sprinkler Rough-in5/7/20155/8/20155/8/2015APART
DetailsKatie Marron
Rough-in inspection for office area wet system. Ok to cover hard lid and grid ceiling areas. Notice items: aux. drain missing, flex drops for grid ceiling to be finalized and possible missed coverage/HVAC obstruction in mechanical bay.