INSP-Final Inspection | 3/24/2015 | 3/25/2015 | 3/25/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/23/2015 | 3/24/2015 | 3/24/2015 | P | CANC |
Troy Cobbley
|
|
|
Mike B is your contact on site. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 3/20/2015 | 3/23/2015 | 3/23/2015 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to the project related fire alarm permit not being scheduled
|
INSP-Sprinkler Rough-in | 2/12/2015 | 2/13/2015 | 2/13/2015 | P | PASS |
Troy Cobbley
|
|
|
Tenting passed. Piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 2/12/2015 | 2/12/2015 | 2/12/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in/Hydro | 2/9/2015 | 2/10/2015 | 2/10/2015 | P | PART |
Troy Cobbley
|
|
|
Overhead hydro tests passed, rough-in passed except the pendant heads in the restrooms are too close together based on extended coverage requirements. Tenting was not complete. Pipe not to be covered.
|
INSP-Sprinkler Rough-in | 2/9/2015 | 2/10/2015 | 2/9/2015 | P | CANC |
Troy Cobbley
|
|
|
RTC inspection. Mike M is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 12/17/2014 | 12/18/2014 | 12/18/2014 | A | PASS |
Troy Cobbley
|
|
|
underground supply line ok to cover
|