Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR14-00889
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 150 N CAPITOL BLVD
Project NameBoise City Hall / Improvements
Customer Number 
ePlanReviewYes
Description
[Boise City Hall / Improvements]
The fire sprinkler scope of work consists of reworking the riser for the new dry system in the parking garage and to change the standard response sprinklers to quick response sprinklers.

(BOISE CITY HALL – Phase II Code Improvements) The main scope of work within this permit is to upgrade the existing parking garage, Annex and CH2 to make them more seismically resistant. PLAN MODIFICATION 10-8-12 – Modification submitted to reconfigure the HR Dept. area. The area will now be mostly all open office without walls dividing the space into individual office. **TLW** A tenant improvement for a portion of the HR Dept in the Annex is also included within this scope of work. Work is to include: [structural upgrades including: new concrete sheer walls, new collectors, repair concrete beams, and concrete deck repair], [construction of interior non-bearing walls to create eight private offices, a conference room, and a copy room], exterior site improvements, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/26/20153/27/20153/27/2015APASS
DetailsForrest France
Completed dry system trip test, riser supervision, final walkthrough and verification of noted correction items.
INSP-Sprinkler Rough-in2/18/20152/19/20152/19/2015APART
DetailsForrest France
Regarding coverage at the exit corridor.
INSP-Sprinkler Rough-in/Hydro2/10/20152/11/20152/12/2015PPART
DetailsForrest France
Concluded satisfactory pneumatic test of the dry system with no pressure loss at the guage.
INSP-Sprinkler Rough-in2/10/20152/10/20152/10/2015PPART
DetailsForrest France
Begin 24 hr air test of the dry system at 1:30PM @ 40psig.
INSP-Sprinkler Rough-in/Hydro1/22/20151/23/20151/23/2015APART
DetailsForrest France
Hydrostatic testing of the new dry system piping passed. Also verified completion of previous C/N items including added coverage at the vestibule, flex couplings at the main, adjusted spacing, outside WF bell installed.
INSP-Sprinkler Rough-in1/22/20151/23/20151/23/2015APART
DetailsForrest France
Completed satisfactory hydrostatic test of the new dry system.
INSP-Sprinkler Rough-in1/16/20151/16/20151/16/2015APART
DetailsForrest France
Completed rough-in inspection of the new dry system at the 2nd floor parking garage- items noted include; overspacing between two branchlines west end, missing coverage at the vestibule, provide flexible couplings at riser main between floors, missing forward flow provision at the riser, new outside WF bell needed, revise existing FDC signage.
INSP-Sprinkler Rough-in1/8/20151/12/20151/12/2015APART
DetailsForrest France