INSP-Final Inspection | 4/20/2015 | 4/21/2015 | 4/21/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 4/17/2015 | 4/20/2015 | 4/20/2015 | A | PART |
Troy Cobbley
|
|
|
Forward flush passed. Could not test flows and tampers due to fire alarm issues.
|
INSP-Sprinkler Rough-in/Hydro | 4/14/2015 | 4/14/2015 | 4/14/2015 | P | PASS |
Troy Cobbley
|
|
|
24hr air test on dry system passed
|
INSP-Sprinkler Rough-in/Hydro | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | PART |
Troy Cobbley
|
|
|
24 hour air test started on dry system at 2pm with 43 psi on the guage.
|
INSP-Sprinkler Rough-in/Hydro | 4/10/2015 | 4/13/2015 | 4/13/2015 | A | PASS |
Troy Cobbley
|
|
|
Overhead 200lb hydro for the wet and dry systems passed. Overhead rough-in for the wet and dry systems passed.
|
INSP-Sprinkler Rough-in | 3/31/2015 | 3/31/2015 | 3/31/2015 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed for the office area, first and second floors, piping can be covered.
|