INSP-Final Inspection | 5/28/2015 | 5/28/2015 | 5/28/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Troy Cobbley
|
|
|
rough-in passed
|
INSP-Final Inspection | 4/8/2015 | 4/9/2015 | 4/10/2015 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled per Rick
|
INSP-Final Inspection | 4/6/2015 | 4/6/2015 | 4/6/2015 | P | CANC |
Troy Cobbley
|
|
|
Overbooked. Inspection will need to be rescheduled. Tried to leave message on contacts voice mail. Cole Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 2/11/2015 | 2/11/2015 | 2/11/2015 | P | PASS |
Troy Cobbley
|
|
|
Three hard lids in the east end of the building are ok to cover.
|
INSP-Sprinkler Rough-in | 2/5/2015 | 2/5/2015 | 2/5/2015 | P | PASS |
Troy Cobbley
|
|
|
Rough-in for upper piping passed. A follow up inspection will be required for the armovers and drops
|