Permit Information
Permit NumberFIR15-00112
StatusFinaled
Name DELTA FIRE SYSTEMS
Site Address 1001 W IDAHO ST
Project NameWashington Federal
Customer Number 
ePlanReviewYes
Description
[Washington Federal]
The fire sprinkler scope of work consists of protecting a six level building. The FP contractor scope of work apparently does not include the first floor and penthouse; however, they are included in the building department scope of work. In addition, the existing pump located in the basement is being replaced with a new pump. Most of the piping and sprinklers are being replaced. Each floor has a tree system with 1”, 1¼” branch piping and 2” mains, with quick response sprinklers.

To remodel the basement, 1st story, 2nd story, 3rd story, 4th story, and penthouse of an existing office building. Work includes the complete replacement of mechanical systems (except the existing chiller and the existing boilers) and upgrading the existing electrical service and system. Basement work is to include a new air handler unit, an enlarged exhaust air pit at grade, compacted gravel fill and a concrete slab at an existing mechanical pit, steel headers and jambs at widened openings in existing masonry walls, a steel header and steel jambs at a widened opening in an existing concrete wall, a masonry wall infill, concrete floor slabs at plumbing and electrical trenches, interior nonbearing walls, 2 restrooms accessible to the disabled, a 1-hr stairway enclosure extension and poured in place concrete steps, 1-hr mechanical shaft extensions and repairs, new interior doors, new interior windows, suspended acoustical ceilings, millwork, and finishes. Cooking operations within the Pantry that create grease laden vapors or that expose the sewer system to grease are NOT allowed. 1st story work is limited to replacing exterior doors and sidelights. 2nd story work includes interior nonbearing walls, 2 restrooms accessible to the disabled, new drinking fountains, suspended acoustical ceilings, millwork, and finishes. 3rd story work includes a 1-hr shaft extension adjacent to an existing stairway enclosure, the structural support for a new floor system between the 2nd and 3rd stories, and suspended acoustical ceilings. 4th story work includes interior nonbearing walls, 2 restrooms accessible to the disabled, suspended acoustical ceilings, millwork, and finishes. Penthouse work includes a new air handler unit, a new opening in the penthouse floor for a new return air duct, and a concrete floor patch where the old return air duct was located. Special Inspection is required for concrete, bolting, welding, epoxy anchors, and expansion anchors. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13, including quick-response fire sprinkler heads installed throughout the building where required, and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/25/20162/26/20162/26/2016APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Final Inspection2/17/20162/18/20162/18/2016APART
DetailsJim Page
All items tested/complete with exception to the basement pre-action system. Contractor will schedule final inspection when pre-action system is ready.
INSP-Final Inspection11/18/201511/19/201511/19/2015PPART
DetailsJim Page
Final fire sprinkler inspection for the 4th floor passed/complete.
INSP-Sprinkler Rough-in/Hydro10/21/201510/22/201510/22/2015APASS
DetailsJim Page
Rough to cover inspcetion passed/complete for the 4th floor, approved for cover. 200 psi hydrostatic test passed/complete for 4th floor.
INSP-Final Inspection10/14/201510/15/201510/15/2015APART
DetailsJim Page
Contractor is working project in phases, final fire inspection for 3rd floor passed/complete. Painters removed escutcheons in janitors closet as well as male & female restrooms for finish coat of paint, will verify installation of escutcheons at BLD final inspection.
INSP-Sprinkler Rough-in/Hydro10/1/201510/1/201510/1/2015PPASS
DetailsJim Page
Rough to cover inspection passed/complete for 3rd floor, approved for cover. 200 psi hydrostatic test passed/complete for 3rd floor.
INSP-Sprinkler Rough-in10/1/201510/1/201510/1/2015PPASS
DetailsJim Page
Rough-in inspection for fourth floor passed/complete
INSP-Final Inspection9/29/201510/1/201510/1/2015ACANC
DetailsJim Page
Scheduled as a final inspection, needed to be scheduled for a rough-in/hydro, inspection, current inspection request rescheduled.
INSP-Final Inspection6/26/20156/29/20156/29/2015APART
DetailsJim Page
Notated areas in red ink on city approved drawings that are approved for final, some areas in mechanical room still needs piping/heads installed. Second floor sprinkler system needs 3 repairs, head located in elevator lobby is to close to heater register, needs to be upgraded to a 200 degree head. Both latrines in elevator lobby have heads that are painted, heads need to be replaced.
INSP-Sprinkler Rough-in6/18/20156/19/20156/19/2015PPASS
DetailsJim Page
Notated with red ink on city approved plans, 2nd floor approved for cover.
INSP-Sprinkler Rough-in6/11/20156/11/20156/11/2015PPASS
DetailsJim Page
Noted areas approved (Basement Level) for cover in red on the onsite city approved drawings.
INSP-Sprinkler Rough-in5/26/20155/27/20155/27/2015APART
DetailsJim Page
Notated the onsite city approved plans for area okay to cover in basement level. End of line restraints not installed, will need to verify install on future inspection.
INSP-Sprinkler Rough-in/Hydro4/14/20154/15/20154/15/2015APART
DetailsKatie Marron
Second Flr Hydrostatic testing of new system piping complete ok. Heads at new ceilings and tie in incomplete at this time.