INSP-Final Inspection | 4/25/2016 | 4/25/2016 | 4/25/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Supply line flush | 4/20/2016 | 4/21/2016 | 4/21/2016 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled, incorrect FIR permit request
|
INSP-Sprinkler Rough-in | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | CANC |
Jim Page
|
|
|
Inspection request was for a different FIR permit, inspection request cancelled.
|
INSP-Final Inspection | 2/25/2015 | 2/26/2015 | 2/26/2015 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler work approved for cover.
|
INSP-Sprinkler Rough-in | 2/24/2015 | 2/25/2015 | 2/26/2015 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications per the scope of work okayed for ceiling cover.
|