Permit NumberFIR15-00198
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 1099 W FRONT ST
Project NameSimplot World Headquarters
Customer Number 
ePlanReviewYes
Description
Simplot World Headquarters for New Fire Alarm System in New 9 story high rise office Bldg. shell and a 5 story annex building. Buildings are connected on the 4th and 5th floors via pedestrian bridges. Fire alarm system includes a voice evacuation system with visual notification, elevator recall, duct detection fire pump that is separate from the fire pump for the garage area, fire command center, fire fighters smoke control panel with status and manual control of the air distribution system and a 2 way radio communications enhancement system. This work is associated with building permit BLD14-02173.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/19/20171/23/20171/23/2017APASS
DetailsJim Page
Final fire alarm inspection passed/complete.
INSP-Final Inspection11/21/201611/22/201611/22/2016APART
DetailsJim Page
Partial final inspection complete for annex builing, audio visual devices for level 1 through 4 of annex complete, commercial hood suppression system monitoring complete for level 4.
INSP-Alarm Testing11/21/201611/22/201611/21/2016PCANC
DetailsJim Page
Call prior to going Phone #: 2089411846 >> Inspection requested via mobile web by Brian A Inspection cancelled via mobile web on Monday, November 21, 2016.
INSP-Alarm Testing11/17/201611/18/201611/18/2016ADONE
DetailsJim Page
Alarm testing for hood suppression systems on level 4 complete.
INSP-Alarm Testing11/17/201611/17/201611/17/2016PCANC
DetailsJim Page
Call prior to going Phone #: 2089411846 >> Inspection requested via mobile web by Brian A Inspection cancelled via mobile web on Thursday, November 17, 2016.
INSP-Alarm Testing11/15/201611/15/201611/15/2016PDONE
DetailsJim Page
Alarm testing complete for smokes and in-ducts for annex, fire sprinkler flow and tamper switches tested and passed, level 4 flow switch needs to be replaced and retested.
INSP-Final Inspection11/14/201611/14/201611/14/2016APART
DetailsJim Page
Fire alarm testing complete for heat and smoke detectors on the simplot world headquarters basement level.
INSP-Final Inspection10/27/201610/27/201610/27/2016PPART
DetailsJim Page
Partial final inspection complete for fire alarm system in Simplot World Headquarters. Final inspection still needs to happen for parking garage and annex.
INSP-Alarm Testing10/26/201610/26/201610/26/2016PDONE
DetailsJim Page
Alarm testing complete for today. Items tested: Floor above floor below notification for all levels of the headquarters building levels parking through 9, automatic shutdown from in duct detection for air handler units 1,2 and 3, audio visual verification for headquarters stack 1 and 2 of level 1 and headquarters parking level, verified signals received from monitoring service, rooftop exhaust unit shutdown and heat trace monitoring for headquarters heat trace on fire sprinkler mains.
INSP-Alarm Testing10/25/201610/25/201610/25/2016PDONE
DetailsJim Page
Automatic stairwell pressurization, horizontal door operation in general alarm testing complete.
INSP-Alarm Testing10/20/201610/20/201610/20/2016PDONE
DetailsJim Page
Alarm testing complete for tamper switches and flow switches on wet pipe fire sprinkler systems located on levels 1 through 9 (signal verification still needs to be performed on level 1 simplot tower dry system). Items that still need inspected: audio/visual signals on parking level dry/standpipe systems as well as dry/standpipe systems being supplied from the JUMP fire pump, audio/visual devices on level 1 and parking level, elevator recall on all elevators, emergency fire door on level 1, in duct and smoke detectors on level 1 and parking level, stairwell pressurization on general alarm, fire alarm interface with kitchen hood monitoring and signal verification for commercial hood fire suppression activation, all fire alarm components associated with annex building and monitoring verification.
INSP-Alarm Testing10/13/201610/17/201610/17/2016PCANC
DetailsJim Page
Inspection request rescheduled for 18OCT2016
INSP-Alarm Testing10/13/201610/17/201610/17/2016ACANC
DetailsJim Page
Inspection request re-scheduled for 18OCT2016
INSP-Alarm Testing10/13/201610/14/201610/14/2016PDONE
DetailsJim Page
Alarm testing complete for in-duct detectors with damper closing, electrical room smoke detectors and fire door release on levels 4, 3 and 2.
INSP-Alarm Testing10/13/201610/14/201610/14/2016ADONE
DetailsJim Page
Alarm testing complete for in-duct detectors with damper closing, electrical room smoke detectors and fire door release on levels 7,6 and 5.
INSP-Alarm Testing10/13/201610/13/201610/13/2016PCANC
DetailsJim Page
Alarm testing rescheduled for following day due to inspection load.
INSP-Alarm Testing10/12/201610/12/201610/12/2016PDONE
DetailsJim Page
In duct detectors tested on levels 8 & 9, door release tested on levels 8 & 9. Devices tested correctly.
INSP-Alarm Testing10/7/201610/7/201610/7/2016PDONE
DetailsJim Page
Alarm testing complete for today, testing will resume on 10OCT2016
INSP-Alarm Testing10/5/201610/5/201610/5/2016PCANC
DetailsJim Page
Call prior to going Phone #: 2089411846 >> Inspection requested via mobile web by Brian A Inspection cancelled via mobile web on Wednesday, October 05, 2016.
INSP-Alarm Testing10/3/201610/4/201610/4/2016PDONE
DetailsJim Page
Audio visual device testing for levels 9 through 2 on main building complete, all A/V's on noted levels operated correctly.
INSP-Alarm Testing10/3/201610/3/201610/3/2016PCANC
DetailsJim Page
Call for access Phone #: 2089411846 >> Inspection requested via mobile web by Brian A Inspection cancelled via mobile web on Monday, October 03, 2016.
INSP-Conference6/2/20166/3/20166/3/2016ADONE
DetailsJim Page
Fire conference complete, discussed height modifications for exterior A/V devices (total of 9 at various exterior locations), due to exterior design A/V devices will be mounted at 10ft 6in off of finish floor.
INSP-Conference2/2/20162/2/20162/2/2016PDONE
DetailsJim Page
Conference complete