INSP-Final Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Jim Page
|
|
|
Fire panel replaced for building, suite 200 notification passed/complete
|
INSP-Final Inspection | 7/13/2015 | 7/13/2015 | 7/13/2015 | P | PART |
Troy Cobbley
|
|
|
The only approved items/devices tested/checked today are flow switch, pump running, tamper switchs and the Suite 200 audio/visual devices. Per the installation contractor phase reversal is not an option which will need to be approved by plan review.
|