INSP-Final Inspection | 3/2/2017 | 3/2/2017 | 3/2/2017 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection pased/complete.
|
INSP-Sprinkler Rough-in | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located on level 3 was completed on 09AUG2016, overhead fire sprinkler piping on level 3 including higher ceilings in apartments approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | PASS |
Jim Page
|
|
|
200 psi hydrostatic test for level 2 complete . Rough to cover inspection for overhead fire sprinkler piping on level 2 complete, overhead fire sprinkler piping located on level 2 approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 8/15/2016 | 8/15/2016 | 8/15/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection complete for level 1, overhead fire sprinkler piping on level 1 approved for cover. 200 psi hydrostatic test for overhead fire sprinkler piping located on level 1 complete.
|
INSP-Sprinkler Rough-in/Hydro | 8/11/2016 | 8/12/2016 | 8/11/2016 | A | CANC |
Jim Page
|
|
|
Inspection request rescheduled by me for 15AUG2016 per conversation with point of contact, Rudy Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 8/8/2016 | 8/9/2016 | 8/9/2016 | A | PART |
Jim Page
|
|
|
200 psi hydrostatic test for overhead fire sprinkler piping located on level 3 complete.
|