INSP-Final Inspection | 9/25/2015 | 9/25/2015 | 9/25/2015 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Alarm Testing | 6/1/2015 | 6/2/2015 | 6/2/2015 | A | PART |
Troy Cobbley
|
|
|
A temporary is being given until the door mag in the warehouse has been addressed.
|
INSP-Alarm Testing | 5/29/2015 | 6/1/2015 | 6/1/2015 | A | DONE |
Troy Cobbley
|
|
|
The water flow pressure switch now functions. Still need the low air switch re-programmed the door mags and lightning protection in the warehouse addressed.
|
INSP-Alarm Testing | 5/26/2015 | 5/27/2015 | 5/27/2015 | P | FAIL |
Troy Cobbley
|
|
|
The low air signal needs to be a "supervisory" signal, not an alarm signal. The "waterflow" pressure switch on the pre-action system did not activate upon the trip of the system.
|