Permit Information
Permit NumberFIR15-00378
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 250 E PARKCENTER BLVD
Project NameALBERTSONS GENERAL OFFICE
Customer Number 
ePlanReviewYes
Description
[Albertsons General Office, 2nd Floor] - Quick Permit
Add, plug and relocate sprinklers to accommodate new wall and ceiling configuration.

(ALBERTSON'S GENERAL OFFICE)(SECOND FLOOR PHASE 1) This building is fully fire sprinklered for area increase and has 60 ft yards on all sides for unlimited area. Permit to renovate the approx. 33,750 sq ft of existing SW office space. Scope of work to include minor demolitions as shown on approved plans, new interior nonbearing partition walls to create new offices and add new systems furniture to open work space. New finishes shall meet IBC chapter 8. New lighting to be installed, the mechanical system will remain and be modified to accommodate the new layout. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**ajs**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/14/201510/15/201510/14/2015APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in7/20/20157/20/20157/20/2015PPASS
DetailsJim Page
Inspected remaining area's associated with this permit, rough-in inspection passed/complete, all area's associated with this FIR approved for cover.
INSP-Final Inspection6/17/20156/17/20156/17/2015PPART
DetailsJim Page
Notated areas that are finaled with red pen on the city approved drawings Still have other areas on the floor that needs to be rough in inspected as well as finaled.
INSP-Sprinkler Rough-in6/16/20156/16/20156/16/2015PPART
DetailsJim Page
Notated area's approved for cover during this inspection in red on city approved plans. The second floor project is being split up to accomidate people, contractor will need to schedule rough to cover inspection for other area on 2nd floor.