INSP-Final Inspection | 1/26/2016 | 1/28/2016 | 1/28/2016 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/7/2016 | 1/11/2016 | 1/11/2016 | A | FAIL |
Troy Cobbley
|
|
|
Will be ok to final when the plastice barrier has been removed from the Game Store location.
|
INSP-Sprinkler Rough-in | 1/7/2016 | 1/11/2016 | 1/11/2016 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed
|
INSP-Sprinkler Rough-in | 1/7/2016 | 1/11/2016 | 1/7/2016 | A | CANC |
Troy Cobbley
|
|
|
We want to coordinate the rough-ins and finals for Permits FIR15-00263 and FIR15-00570 to all happen at the same time, since they are both part of Overland Park Plaza. Please contact Gordon Rogers (his phone # is given) at least a half hour prior to arrival so that he can have time to make it there himself. Phone #: ###-#### >> Inspection requested via web by Connie Danes Inspection cancelled from web by: Connie Danes
|
INSP-Sprinkler Rough-in/Hydro | 1/7/2016 | 1/11/2016 | 1/7/2016 | A | CANC |
Troy Cobbley
|
|
|
We want to coordinate the rough-ins and finals for Permits FIR15-00263 and FIR15-00570 to all happen at the same time, since they are both part of Overland Park Plaza. Please contact Gordon Rogers (his phone # is given) at least a half hour prior to arrival so that he can have time to make it there himself. Thanks! Phone #: ###-#### >> Inspection requested via web by Connie Danes Inspection cancelled from web by: Connie Danes
|
INSP-Sprinkler Rough-in | 9/22/2015 | 9/29/2015 | 9/29/2015 | A | PASS |
Troy Cobbley
|
|
|
See my marked ups on plan sheet FP3 and FP4 for areas inspected. No insulation of the attic space or provisions for heat have been provided at this point.
|