Permit Information
Permit NumberFIR15-00640
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 888 N MAPLE GROVE RD
Project Name#888 Ashville Commons 4-Plex
Customer Number 
ePlanReviewYes
Description
[Ashville Commons 4-Plex Building D - #888]
The fire sprinkler scope of work consists of CPVC piping is being used with extended coverage residential sprinklers to protect a two level, four unit apartment building using NFPA 13R

The underground piping is under permit FIR15-00538

Bldg D (4) - Type 1 (Elev 4, A-203): To construct a new 3,804 sq. ft., two story, Four unit, apartment building. Each unit has two bedrooms, two bathrooms, and 951 square feet. The 1st story units are required to be Type 'B' units. All units share a common path of egress into and through a 1/2-hour rated exit corridor with 20 minute fire-resistive, listed, labeled, self-closing door assemblies from the dwelling units into the corridor. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partitions and one hour horizontal assemblies are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00300 & PUD12-00012 Per Planning and Zoning. **SRZ*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/18/201511/19/201511/19/2015APASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in/Hydro10/7/201510/8/201510/8/2015PPASS
DetailsTroy Cobbley
Overhead hydro test passed.
INSP-Sprinkler Rough-in/Hydro10/6/201510/7/201510/7/2015AFAIL
DetailsTroy Cobbley
Overhead hydro test failed again.
INSP-Sprinkler Rough-in/Hydro10/6/201510/6/201510/6/2015PFAIL
DetailsTroy Cobbley
Above ground hydro test failed due to visible loss on guage.
INSP-Sprinkler Rough-in/Hydro10/2/201510/5/201510/5/2015PCANC
DetailsTroy Cobbley
Contact - Matt Robison - ###-#### Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush10/2/201510/5/201510/5/2015APASS
DetailsTroy Cobbley
Underground flush passed
INSP-Sprinkler Rough-in/Hydro9/30/201510/1/201510/1/2015PCANC
DetailsTroy Cobbley
No water on site. No hydro performed.
INSP-Supply line flush9/30/201510/1/201510/1/2015ACANC
DetailsTroy Cobbley
No water on site. No flush performed.
INSP-Sprinkler Rough-in/Hydro9/28/20159/29/20159/29/2015PCANC
DetailsTroy Cobbley
United water has not provided water to site yet.
INSP-Supply line flush9/28/20159/28/20159/29/2015PCANC
DetailsTroy Cobbley
United water has not provided water to site yet.
INSP-Sprinkler Rough-in/Hydro9/24/20159/25/20159/25/2015PPASS
DetailsTroy Cobbley
Rough-in and tenting passed. Piping can be covered.
INSP-Sprinkler Rough-in9/23/20159/24/20159/24/2015PCANC
DetailsTroy Cobbley
Matt is the contact. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus