INSP-Final Inspection | 11/2/2016 | 11/2/2016 | 11/2/2016 | P | PASS |
Katie Marron
|
|
|
Verified central monitoring station receiving signals, tested a trouble, alarm and supervisory.
Scope of work complete, permit finaled.
|
INSP-Final Inspection | 10/26/2016 | 10/28/2016 | 10/28/2016 | P | FAIL |
Jim Page
|
|
|
All devices tested on fire alarm system, only item left is to verify monitoring, phone lines did not have dial tone at time of inspection.
|