Permit Information
Permit NumberFIR15-00687
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 10482 W UTAHNA RD
Project NameThe Vineyard at Eagle
Customer Number 
ePlanReviewYes
Description
[The Vineyard at Eagle Promenade]
The fire sprinkler scope of work consists of two level apartment complex protected by a NFPA 13R system. The system utilizes CPVC piping and extend coverage residential sprinklers.

(VINEYARD AT EAGLE PROMENADE – APARTMENT BUILDING) An NFPA 13-R fire sprinkler system is required for occupancy. To construct a new 37,353 square foot apartment building for seniors (19,283 square feet 1st story and 18,070 square feet 2nd story). A total of 30 dwelling units will be provided. Occupants do not live in a supervised environment and do not receive custodial care (i.e. this building is not an I-1 Occupancy). Two dwelling units will comply as Type A and 28 dwelling units will comply as Type B. Work is to include concrete footings, concrete piers, concrete stem walls, concrete slabs on grade, exterior wood stud bearing walls, interior wood stud bearing walls, wood beams, wood columns, wood shear walls, a wood joist floor system, a wood truss roof system, architectural laminated asphalt roof shingles, horizontal lap hardboard siding, board and batten style hardboard siding, shake style hardboard siding, manufactured stone veneer wainscot, interior 1-hr corridors, interior 1-hr stairway enclosures, interior doors, exterior doors, exterior windows, a gas fireplace, millwork, and finishes. A separate permit is required for the solar panels on the roof. Special Inspection is required for soils, concrete, and post installed anchors to concrete. The engineered trusses are a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. A blower door test will be required for each dwelling unit to show that the air changes per hour are not less than 5 and not more than 7, otherwise, an outside air duct connected to each return air plenum is required. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/13/20164/15/20164/15/2016APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in/Hydro3/17/20163/18/20163/18/2016ACANC
DetailsTroy Cobbley
OH Hydro Passed
INSP-Sprinkler Rough-in2/12/20162/12/20162/12/2016PPASS
DetailsTroy Cobbley
See the city approved plans for pendant heads marked "ok" where piping can be covered in the lower ceilings in the first floor east end rooms.
INSP-Sprinkler Rough-in2/1/20162/1/20162/1/2016PPASS
DetailsKatie Marron
Soffit heads in 7 rooms on 2nd floor "ok", plans marked accordingly.
INSP-Sprinkler Rough-in1/15/20161/15/20161/15/2016PPASS
DetailsJim Page
Notated area's with red ink on the city approved drawings inspected for rough to cover, area's notated approved for cover
INSP-Sprinkler Rough-in1/5/20161/6/20161/6/2016PPART
DetailsJim Page
Rough to cover inspection performed for phase 3, notated with red ink on the city approved drawings that are okay to cover.
INSP-Sprinkler Rough-in12/30/201512/31/201512/31/2015APART
DetailsKatie Marron
Phase 2 Rough to cover ok at the following areas and as marked on the job site plans:
-Second floor all Phase 2 rooms and corridors EXCEPT Common Rooms
-First room all Phase 2 rooms EXCEPT dry sidewall over porches.

Still to be inspected are the first floor corridors, common areas and elevator area
INSP-Sprinkler Rough-in12/30/201512/30/201512/30/2015PCANC
DetailsKatie Marron
Phase 2 RTC
Please call Ricky 30 min prior ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
INSP-Sprinkler Rough-in12/23/201512/23/201512/23/2015PPART
DetailsKatie Marron
2nd Floor
Two more rooms marked "ok" on the plans where rough-in and tenting is passed and the piping can be covered. Verified previous inspection notice of dry sidewalls have been installed all four rooms on 2nd flr inspected so far.
INSP-Sprinkler Rough-in12/21/201512/22/201512/22/2015APART
DetailsTroy Cobbley
2nd Floor
has two rooms marked "ok" on the plans where the rough-in and tenting is passed and the piping can be covered. Except the piping for the balcony sidewalls has not been installed. This piping will need to be inspected prior to covering.
INSP-Sprinkler Rough-in12/11/201512/14/201512/14/2015APASS
DetailsTroy Cobbley
RTC - OH 1st floor - Phase 1 See the city approved plans for the branchlines marked "ok" where piping rough-in passed. Need another inspection to verify the 3 1/2" of insulation installed in the joist channels.
INSP-Sprinkler Rough-in11/17/201511/17/201511/17/2015PPASS
DetailsTroy Cobbley
Todays inspection was just for the first floor corridor riser nipples and the short lenght of 1" piping from the riser nipples to the corridor walls. Contractor needs to cover this piping which is approved to do so. See the city approved plans for piping circled in red.