INSP-Final Inspection | 5/13/2016 | 5/17/2016 | 5/17/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Final Inspection | 5/12/2016 | 5/13/2016 | 5/13/2016 | A | PART |
Jim Page
|
|
|
Partial final inspection complete, inspection of apartments/garages passed/complete, will be able to be signed off as complete when fire alarm inspection has been performed, verification of signals from flow swith/tamper switches needs to be completed before permit can be finaled.
|
INSP-Supply line flush | 3/1/2016 | 3/3/2016 | 3/3/2016 | A | DONE |
Jim Page
|
|
|
Underground main supply flush complete.
|
INSP-Sprinkler Rough-in | 1/7/2016 | 1/7/2016 | 1/7/2016 | P | PASS |
Jim Page
|
|
|
Tenting inspection passed/complete, all piping for this building approved for cover.
|
INSP-Sprinkler Rough-in | 1/5/2016 | 1/5/2016 | 1/5/2016 | P | CANC |
Jim Page
|
|
|
Spoke with Anthony, phone number ###-####, contractor will reschedule this inspection request to coincide with tenting for rough to cover. this inspection request cancelled per conversation with Anthony.
|
INSP-Sprinkler Rough-in | 1/4/2016 | 1/4/2016 | 1/4/2016 | P | PART |
Jim Page
|
|
|
First floor rough to cover inspection passed/complete, approved for cover. 2nd floor piping still needs tenting installed, cannot cover 2nd floor piping until tenting is inspected and approved.
|
INSP-Sprinkler Rough-in/Hydro | 12/21/2015 | 12/22/2015 | 12/22/2015 | A | PASS |
Jim Page
|
|
|
200 psi hydrostatic test for 2 hours passed/complete for overhead fire sprinkler piping.
|
INSP-Sprinkler Rough-in/Hydro | 12/18/2015 | 12/21/2015 | 12/21/2015 | A | CANC |
Jim Page
|
|
|
Hydrostatic test cancelled per coversation with POC, Anthony phone# ###-####, will be rescheduled for later date.
|
INSP-Sprinkler Rough-in/Hydro | 12/18/2015 | 12/18/2015 | 12/18/2015 | P | FAIL |
Troy Cobbley
|
|
|
Went back for a second time and was unable to verify test due to contractor draining system after finding a leak.
|
INSP-Sprinkler Rough-in/Hydro | 12/17/2015 | 12/17/2015 | 12/17/2015 | P | FAIL |
Jim Page
|
|
|
Contractor had a dry fit, system could not hold 200 psi, contractor will reschedule hydrostatic test for overhead.
|
INSP-Sprinkler Rough-in/Hydro | 12/16/2015 | 12/17/2015 | 12/17/2015 | A | CANC |
Jim Page
|
|
|
Please give Jake a call when you are headed out! Thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 12/14/2015 | 12/16/2015 | 12/16/2015 | A | CANC |
Jim Page
|
|
|
Spoke with point of contact, Anthony, phone #: ###-####, project is not ready, he will reschedule inspection for a later date. Inspection request cancelled.
|