INSP-Final Inspection | 11/20/2015 | 11/20/2015 | 11/20/2015 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Final Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 | P | PART |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete for this FIR permit, will final this FIR permit when core/shell FIR/BLD permits are inspected and complete.
|
INSP-Sprinkler Rough-in | 11/10/2015 | 11/12/2015 | 11/12/2015 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection passed/complete for cooler/freezer fire sprinkler heads. Rough to cover inspection complete for this FIR permit, all area's approved for cover.
|
INSP-Sprinkler Rough-in | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | PASS |
Troy Cobbley
|
|
|
The piping to the pendant heads in the Service Area is ok to cover.
|
INSP-Sprinkler Rough-in | 10/29/2015 | 10/29/2015 | 10/29/2015 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection passed/complete for overhead fire sprinkler pipe, approved for cover.
|
INSP-Sprinkler Rough-in | 10/12/2015 | 10/12/2015 | 10/12/2015 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for the hard lids passed/complete, approved for cover.
|