Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberFIR15-00709
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 3050 S SHOSHONE ST
Project NameHoliday Inn Express
Customer Number 
ePlanReviewYes
Description
[Holiday Inn Express]
The fire sprinkler scope of work consists of a four level motel protected with a NFPA 13R system. There is also a Class I standpipes in two stair towers.

(HOLIDAY INN EXPRESS & SUITES) Permit is to construct a new 60,760 square foot hotel building. This building will have 109 total units with 7 of those units being accessible units. Scope of work includes: construction of the building shell and core, complete build-out of the interior and related site improvements. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/9/20168/10/20168/10/2016APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection8/8/20168/9/20168/9/2016APART
DetailsTroy Cobbley
A temporary occupancy is ok for life safety with Scott's permission. I need as-builts, replace head in Room 105 and the exposed plastic pipe in the east stair well corrected.
INSP-Final Inspection8/8/20168/8/20168/8/2016PFAIL
DetailsTroy Cobbley
Need outside alarm bell installed and tested, need flow switches tested, need as-builts, need damaged heads replaced and missing canopies and ceiling tile installed. Need revised floor plan/wall layout for laundry area.
INSP-Final Inspection8/4/20168/5/20168/5/2016PFAIL
DetailsTroy Cobbley
Due to problems on the fire alarm system todays inspection was a walk through of the 4th and 3rd floors. I noted the need for as-builts due to pipe routing changes at the stairwells and the added heads beneath the first floor tilt up doors. Contractor did not have any approved drawings or small documents except for the revised first floor plans.
INSP-Final Inspection8/3/20168/4/20168/4/2016PCANC
DetailsTroy Cobbley
Richard Clark is the contact on the inspection. Richard would like a final inspection on 8/4/16 PM. Thank you Phone #: ###-#### Inspection requested via web by Kay Haney
INSP-Sprinkler Rough-in/Hydro8/2/20168/3/20168/3/2016APASS
DetailsTroy Cobbley
Please schedule the inspection Overhead hydro's for 1st, 2nd, and 3rd floors passed.
INSP-Sprinkler Rough-in7/12/20167/13/20167/13/2016PPASS
DetailsTroy Cobbley
See the city approved plans for location of pendant sprinkler heads that are ok to cover today. Conference room/adjoining room.
INSP-Sprinkler Rough-in/Hydro7/7/20167/8/20167/8/2016ACANC
DetailsTroy Cobbley
Cancel per Ben
INSP-Sprinkler Rough-in/Hydro7/5/20167/6/20167/6/2016APART
DetailsTroy Cobbley
4th floor hydro test passed. 3rd, 2nd and the standpipes failed due to visible loss on guages.
INSP-Sprinkler Rough-in6/7/20166/8/20166/8/2016APASS
DetailsTroy Cobbley
The piping above the second and third floor hardlid at the west stairs is ok to cover and the second floor elevator lobby piping is ok to cover.
INSP-Sprinkler Rough-in6/3/20166/3/20166/3/2016PPART
DetailsTroy Cobbley
2nd floor rough to cover inspection for the hardlids in the corridor passed except for the very west end in front of the stairs where a pendant head is missing.
INSP-Conference5/24/20165/25/20165/25/2016ADONE
DetailsTroy Cobbley
Mike and I spoke about fire rated assemblies and I deferred him to the building inspector
INSP-Sprinkler Rough-in5/19/20165/19/20165/19/2016PPART
DetailsJim Page
Rough to cover inspection complete for level 3 corridor soffits, level 3 corridor soffits approved for cover.
INSP-Sprinkler Rough-in5/4/20165/5/20165/5/2016PPASS
DetailsTroy Cobbley
The rough to cover inspection for the main corridor/soffits of the 4th floor passed. Piping can be covered.
INSP-Sprinkler Rough-in4/25/20164/26/20164/26/2016PPASS
DetailsJim Page
Rough to cover inspection complete for overhead fire sprinkler piping on 1st and 2nd floor hardlids, 1st and 2nd floor hardlids approved for cover.
INSP-Sprinkler Rough-in4/13/20164/14/20164/14/2016APASS
DetailsTroy Cobbley
Rough to cover 3rd and 4th floor passed. Piping can be covered.
INSP-Sprinkler Rough-in4/7/20164/8/20164/8/2016APASS
DetailsTroy Cobbley
3rd and 4th floor Rooms inspection passed. Piping above rooms and in stairwells can be covered. Corridor piping is not complete yet.
INSP-Sprinkler Rough-in4/6/20164/6/20164/6/2016PDONE
DetailsTroy Cobbley
Today was more of a conference. Robert and I discussed earth quake bracing attachment for the stand pipes. He also relocated the pendant in the Roof Access room for better coverage.
INSP-Sprinkler Rough-in/Hydro4/4/20164/5/20164/5/2016APASS
DetailsTroy Cobbley
4th floor and 3rd floor piping above Resident Rooms is ok to cover. Hall way piping is not complete and can not be covered. Robert and I spoke about two rooms on each floor where the sidewall heads are overspaced. This issue is to be addressed prior to cover either through new heads/piping or a change in sidewall heads. Either direction taken will need to be approved prior to cover.
INSP-Sprinkler Rough-in4/4/20164/4/20164/4/2016PCANC
DetailsTroy Cobbley
4th floor insulation was not ready til late in the afternoon when I was not available for the inspection. I rescheduled for tomorrow morning early.
INSP-Sprinkler Rough-in/Hydro3/30/20163/31/20163/31/2016APART
DetailsTroy Cobbley
Todays inspection was just for cover on the 4th floor rooms. Rough-in for the rooms only passed but can't be covered yet since it appears that the concealed space is to be filled with insulation. If so I will need to verify that the insulation has been installed above the piping like a typical tenting inspection. At that point an approval for cover can be given.
INSP-Sprinkler Rough-in3/8/20163/8/20163/8/2016PPASS
DetailsTroy Cobbley
The first floor main corridor pipe hanger attachment points are ok to cover. The is for the 2 1/2" main and 6" main.