INSP-Final Inspection | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete.
|
INSP-Sprinkler Rough-in/Hydro | 12/14/2015 | 12/14/2015 | 12/14/2015 | P | PASS |
Troy Cobbley
|
|
|
2nd floor hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 12/7/2015 | 12/8/2015 | 12/8/2015 | P | PART |
Troy Cobbley
|
|
|
Overhead hydro of the first floor passed. The overhead hydro of the second floor failed twice.
|
INSP-Sprinkler Rough-in | 11/10/2015 | 11/12/2015 | 11/12/2015 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping can be covered.
|