INSP-Final Inspection | 2/17/2016 | 2/18/2016 | 2/18/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete.
|
INSP-Supply line flush | 2/16/2016 | 2/17/2016 | 2/17/2016 | P | DONE |
Jim Page
|
|
|
Underground main line flush complete.
|
INSP-Final Inspection | 2/12/2016 | 2/12/2016 | 2/12/2016 | P | FAIL |
Katie Marron
|
|
|
Inspection was not a final. It was hydro test for the underground. System dropped to 172 psi from 200 psi, failed. System to be retested.
|
INSP-Sprinkler Rough-in | 12/30/2015 | 12/31/2015 | 12/31/2015 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground piping passed/complete, approved for cover. Hydrostatic 2 hour @ 200psi test passeed/complete.
|