INSP-Final Inspection | 5/25/2016 | 5/26/2016 | 5/26/2016 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete.
|
INSP-Alarm Testing | 5/24/2016 | 5/25/2016 | 5/25/2016 | P | CANC |
Troy Cobbley
|
|
|
Overbooked. Rescheduled for tomorrow morning.
|
INSP-Final Inspection | 3/2/2016 | 3/3/2016 | 3/3/2016 | A | PART |
Troy Cobbley
|
|
|
Fire alarm is complete in the South tenant space of the building. As-builts need submitted showing the correct device addresses and the new strobe.
|
INSP-Final Inspection | 2/24/2016 | 2/25/2016 | 2/25/2016 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for locations of corrections needed on the horn strobe circuits This includes an add and candella changes. The beam detector at the south end of building has been deleted so spot type detectors will need to be placed. Horns did not sync.The smoke detector in the riser room is mislabeled as water flow. The manual pull stations tested ok. None of the devices in the north half of the building have been installed yet.
|