Information based on query as of Wednesday, June 19, 2024.
Permit Information
Permit NumberFIR15-00808
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 529 E PARKCENTER BLVD
Project NameDistrict @ Parkcenter Cottage
Customer Number 
ePlanReviewYes
Description
[The District at Park Center - Cottage Building A - #1]
The fire sprinkler scope of work consists of protecting a two level apartment building per NFPA 13R. The system is supplied by 4”x50’ ± C-900 underground piping. Extended coverage residential sprinklers and CPVC piping are being utilized.

Plan Mod #1
Installed pendents instead of sidewalls in the SW and SE corner of the first

(THE DISTRICT AT PARKCENTER - COTTAGE BUILDING A - #1) (The drawings are filed under permit BLD14-01818 in ePlanReview) To construct a 10 dwelling unit two story apartment building with each unit having its own garage (i.e. 10 garages). The total floor area of this building is about 14,708 square feet (8,374 square feet 1st story and 6,334 square feet 2nd story). All ground floor units are required to comply as Type B units. Two of those ground floor units within Cottage Building A - #2 are required to comply as Type A units. Work is to include interior nonbearing walls, 1-hr bearing walls, 1-hr roof-ceiling assemblies, 1-hr floor-ceiling assemblies, 1-hr dwelling unit separations, attic insulation, interior doors, exterior windows and doors, insulated exterior walls, “Hardi-board” exterior siding, exterior manufactured stone wainscot, composition roof shingles, common stairways within a 1-hr corridor, private interior stairways, garages, garage overhead doors, millwork, and finishes. Structural work includes concrete footings, concrete stem walls, concrete floor slabs on grade with thickened footings at interior bearing walls, wood floor trusses, wood roof trusses, wood columns, wood beams, and shear walls. Special inspection is required for soils, concrete, and wood. The designs for the roof trusses and floor trusses are deferred submittal items. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/28/201611/29/201611/29/2016APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in/Hydro8/25/20168/25/20168/25/2016PDONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping complete.
INSP-Supply line flush8/19/20168/22/20168/22/2016PDONE
DetailsJim Page
Underground main supply line flush complete
INSP-Sprinkler Rough-in8/16/20168/17/20168/17/2016PPASS
DetailsJim Page
Tenting inspection for overhead fire sprinkler piping located in attic spaces complete, overhead fire sprinkler piping located in attic area's approved for cover.
INSP-Sprinkler Rough-in8/10/20168/10/20168/10/2016PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping complete. Overhead fire sprinkler piping located between living area's approved for cover, overhead fire sprinkler piping located in attic spaces cannot be covered until a tenting insulation inspection has been completed.
INSP-Sprinkler Rough-in7/27/20167/28/20167/28/2016APASS
DetailsJim Page
Tenting inspection complete for level 3, all overhead fire sprinkler piping located in the attic space of level 3 approved for cover.
INSP-Sprinkler Rough-in7/18/20167/19/20167/19/2016APART
DetailsJim Page
Rough to cover/tenting inspection for overhead fire sprinkler piping complete for northeast section of level 3, overhead fire sprinkler piping in the northeast section of level 3 approved for cover.
INSP-Sprinkler Rough-in/Hydro6/17/20166/20/20166/20/2016ACANC
DetailsJim Page
Inspection request re-scheduled per conversation with Mark, phone number ###-#### due to pressure loss for the hydrostatic test.
INSP-Sprinkler Rough-in6/8/20166/9/20166/9/2016PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping complete for level one, level one approved for cover.
INSP-Sprinkler Rough-in/Hydro6/8/20166/9/20166/9/2016PPART
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping located on level one complete.