INSP-Final Inspection | 1/21/2016 | 1/21/2016 | 1/21/2016 | P | PASS |
Jim Page
|
|
|
Previously noted items repaired, final fire sprinkler inspection passed/complete.
|
INSP-Final Inspection | 1/16/2016 | 1/19/2016 | 1/19/2016 | A | PART |
Jim Page
|
|
|
Trip test for dry system complete, final fire sprinkler inspection complete, dry pendant heads for dry system canopy are too long, dry pendant heads on order and will be replaced when received, once heads are changed the fire sprinkler system can be finaled.
|
INSP-Sprinkler Rough-in/Hydro | 1/15/2016 | 1/15/2016 | 1/15/2016 | P | PASS |
Jim Page
|
|
|
24 hour air test passed/complete for dry system.
|
INSP-Sprinkler Rough-in/Hydro | 1/14/2016 | 1/14/2016 | 1/14/2016 | P | PART |
Jim Page
|
|
|
2 hour hydrostatic test @ 200 psi passed/complete for dry system. 24 hour air test started at 1430hrs @ 45psi.
|
INSP-Final Inspection | 1/14/2016 | 1/15/2016 | 1/14/2016 | A | CANC |
Jim Page
|
|
|
Please call Don with time frame. Trip test dry system and final. Phone #: ###-#### >> Inspection requested via web by Jeff Packham Inspection cancelled from web by: Jeff Packham
|
INSP-Sprinkler Rough-in | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection passed/complete for tenant space, all fire sprinkler piping for this tenant space approved for cover.
|