INSP-Final Inspection | 6/15/2017 | 6/15/2017 | 6/15/2017 | A | PASS |
Jim Page
|
|
|
Final inspection for underground supply passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 5/25/2017 | 5/26/2017 | 5/26/2017 | A | PASS |
Jim Page
|
|
|
Underground re-hydro tested due to developed leak from seperate contractor impacting thrust block. Restraints have been installed to protect underground from seperation due to site work and underground re-hydro complete.
|
INSP-Sprinkler Rough-in | 1/5/2016 | 1/6/2016 | 1/6/2016 | A | PART |
Jim Page
|
|
|
Underground In Building Riser/thrust block inspected, approved for cover, remainder of underground still needs installed, contractor will schedule rest of underground for later date when completed.
|
INSP-Sprinkler Rough-in | 12/31/2015 | 1/5/2016 | 1/5/2016 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with Brian, phone number ###-####, inspection will be rescheduled.
|