INSP-Final Inspection | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for this permit on level 7 passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection complete for level 7, hydrostatic test complete for overhead fire sprinkler piping on level 7, tamper switch and flow switch satisfactorily tested for level 7.
|
INSP-Sprinkler Rough-in | 6/15/2016 | 6/15/2016 | 6/15/2016 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for fire sprinkler piping above gridded area's on level 7 complete, fire sprinkler above gridded area's approved for cover.
|
INSP-Sprinkler Rough-in | 1/12/2016 | 1/15/2016 | 1/15/2016 | A | PASS |
Jim Page
|
|
|
Rough in inspection complete, notated with red ink on city approved drawings area's inspected
|