Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR15-00893
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 255 N STEELHEAD WAY
Project NamePRIMARY WEAPONS T.I.
Customer Number 
ePlanReviewYes
Description
[Primary Weapons Systems, TI] - Quick Permit
Add, plug and relocate sprinklers to accommodate new wall and ceiling configuration.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.


(PRIMARY WEAPONS SYSTEMS) **Plan modification to include new interior nonbearing wall to create a new office (121 sq. ft. 11’x11’), remove a portion of wall to widen door opening for new double door. 11-25-2015 JG** Permit is to remodel an existing 60,903 sq. ft. building. Approval contingent upon adhering to the approved plans on file. Work to include: installation of new chain link fence to separate loading dock areas, adding a roll up door to the mechanical equipment room, adding an acoustical tile drop ceiling, removing the existing mechanical equipment and boilers from the site and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Fire sprinkler system used for building area increase and for fire area. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/16/20162/16/20162/16/2016PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in1/21/20161/21/20161/21/2016PPASS
DetailsTroy Cobbley
Rough-in passed. Piping can be covered. Plans/as-builts need submitted showing the reduced scope of work.