INSP-Final Inspection | 5/5/2016 | 5/6/2016 | 5/6/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Annual inspection is being performed by Shilo Automatic Sprinkler. I noted that the existing backflow preventer is "surging" which is causing the flow switch to continually acivated.
|
INSP-Final Inspection | 5/2/2016 | 5/4/2016 | 5/4/2016 | A | CANC |
Troy Cobbley
|
|
|
Canceled due to fire alarm issues.
|
INSP-Conference | 4/20/2016 | 4/22/2016 | 4/22/2016 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test passed
|
INSP-Conference | 4/20/2016 | 4/21/2016 | 4/21/2016 | A | DONE |
Troy Cobbley
|
|
|
Air test started at 9:30. See pressure marked on guage.
|
INSP-Sprinkler Rough-in/Hydro | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test (200psi) passed.
|
INSP-Sprinkler Rough-in | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PART |
Troy Cobbley
|
|
|
Rough-in inspection mostly passed. Missing earthquake bracing. Missing flexible couplings at top of risers. Missing clearance at piping penatration into new building. Missing information on plans showing how long the sprig ups should be. Don't know if sprig ups and the way the riser nipples are installed are approved since they are not shown on the plans. Need verification from plan review. Need air maintenance device.
|