INSP-Final Inspection | 4/8/2016 | 4/11/2016 | 4/11/2016 | A | FAIL |
Troy Cobbley
|
|
|
The two standard responce pendants have not been changed to quick responce. Ron is going to walk the project and make sure all is right.
|
INSP-Sprinkler Rough-in | 1/22/2016 | 1/25/2016 | 1/25/2016 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. I noted two standard responce pendant heads that will need to be changed to quick responce prior to a final sign off.
|
INSP-Sprinkler Rough-in | 1/21/2016 | 1/22/2016 | 1/22/2016 | A | FAIL |
Troy Cobbley
|
|
|
No plans on site and the installing contractor is trying to get ahold of the permit holder for the drawings. No inspection was performed.
|