Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberFIR16-00017
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 7578 W SAXTON DR
Project NameKensington Apartments Bldg T
Customer Number 
ePlanReviewYes
Description
[Kensington Apartments - Building T]
The fire sprinkler scope of work consists of a NFPA 13R system for a four level apartment building. There floor level control valves in a valve house. The system is supplied by 2” underground through a 2” backflow preventer to 1 ½” riser. The system piping is 1” CPVC.

There are 2 manual 4” standpipes. The standpipes are a deferred submittal

Note: To achieve 500 Gpm @ 100 Psi a the top most standpipe outlets the fire apparatus is required to supply 505 Gpm @ 128 Psi

The underground for buildings T, O & P are under permit FIR15-00689
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/20/20169/23/20169/23/2016PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete, hydrostatic test was completed on 06MAY2016
INSP-Sprinkler Rough-in5/31/20165/31/20165/31/2016APART
DetailsJim Page
Tenting Inspection complete for overhead fire sprinkler piping in the 3rd level attic spaces as well as 4th level fire sprinkler piping, area's inspected approved for cover with exception to the breeze-ways, the piping crossing the breeze-way an all floors cannot be covered until an approved method is installed to keep this section of piping from freezing
INSP-Sprinkler Rough-in/Hydro5/5/20165/6/20165/6/2016APART
DetailsJim Page
Rough to cover inspection complete, 1st level overhead fire sprinkler piping approved for cover with exception to the fire sprinkler piping crossing the breeze-way, the piping crossing the breeze-way an all floors cannot be covered until an approved method is installed to keep this section of piping from freezing. 2nd level overhead fire sprinkler piping approved for cover with exception to breeze-way, 3rd level piping approved for cover will exception to breeze-way and piping that is located in attic space, the piping in th attic space needs to be tented with insulation, once tenting inspection is complete this piping can be covered, 4th level rough in inspection complete, all piping on 4th level cannot be covered until tenting inspection is complete. Any overhead fire sprinkler piping that is covered before tenting inspection will have covering material removed for the inspection.
INSP-Sprinkler Rough-in/Hydro5/5/20165/5/20165/5/2016PCANC
DetailsJim Page
Please call Jake when you are heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro4/25/20164/29/20164/28/2016PCANC
DetailsJim Page
Please call when you are headed out. Thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro4/20/20164/26/20164/25/2016PCANC
DetailsJim Page
Please call Jake when you are heading out. Thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro3/10/20163/10/20163/10/2016PPASS
DetailsJim Page
Underground rough to cover inspection complete, underground supply approved for cover. Hydrostatic test (200psi for 2 hours)for underground passed/complete.