INSP-Final Inspection | 3/3/2016 | 3/3/2016 | 3/3/2016 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection for elevator passed/complete.
|
INSP-Sprinkler Rough-in/Hydro | 3/2/2016 | 3/3/2016 | 3/3/2016 | P | CANC |
Jim Page
|
|
|
Inspection request is for a fire alarm final, not a sprinkler rough-in/hydro, cancelling this inspection request and generating the correct request.
|
INSP-Final Inspection | 2/29/2016 | 3/2/2016 | 3/2/2016 | P | FAIL |
Troy Cobbley
|
|
|
Since the elevator contractor did not show up we could not get acces to the last heat detector to be tested in the elevator pit.
|
INSP-Final Inspection | 2/19/2016 | 2/23/2016 | 2/23/2016 | P | FAIL |
Troy Cobbley
|
|
|
Provide plan modifications and correct recall function as discussed. Need to test heat detectors as well.
|