INSP-Final Inspection | 6/21/2016 | 6/22/2016 | 6/22/2016 | A | PASS |
Jim Page
|
|
|
Previously noted items have been addressed/repaired. Final fire alarm inspection passed/complete
|
INSP-Final Inspection | 6/14/2016 | 6/16/2016 | 6/16/2016 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing the three peaked sky lights with additional protection and show the two ceiling levels that surround the sky lights, show candella changes on the second floor, provide sync for all notification devices, provide additional notification in the basement lobby, provide the sample tubes and remote annunciators for the duct smoke detectors. The only devices tested today was the first floor lobby manual pull station, four fire/smoke damperson the first floor and the south duct detector on the second floor. All other devices need to be tested. I noted that the first floor manual pull station activated elevator recall which is not allowed in current code.
|
INSP-Final Inspection | 6/14/2016 | 6/15/2016 | 6/14/2016 | A | CANC |
Jim Page
|
|
|
If you cannot reach me, please call Kenny Leslie @ ###-#### or Mike Kroll @ ###-#### Phone #: ###-#### >> Inspection requested via web by Josiah Monett Inspection cancelled from web by: Josiah Monett
|