INSP-Final Inspection | 12/14/2016 | 12/15/2016 | 12/15/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 9/27/2016 | 9/29/2016 | 9/29/2016 | P | PASS |
Jim Page
|
|
|
24 hour air test for dry system complete.
|
INSP-Sprinkler Rough-in/Hydro | 9/27/2016 | 9/28/2016 | 9/28/2016 | A | PART |
Jim Page
|
|
|
200 psi hydrostatic test for overhead fire sprinkler piping complete. Rough in inspection for overhead fire sprinkler piping complete. 24 hour air test started at 11:00AM 28SEPT2016 with 40psi on gauge.
|