Permit Number | FIR16-00102 |
Status | Finaled |
Name |
ABSOLUTE FIRE PROTECTION
|
Site Address |
400 S BROADWAY AVE
|
Project Name | WGP 1 St. Luke's TI 3rd Floor |
Customer Number | |
ePlanReview | Yes |
Description |
The fire sprinkler scope of work consists of remodeling the 3rd floor ONLY. The CPVC piping will be replaced with steel. The sprinklers in ceiling tile areas are on flex drops. Hydraulic calculations were provided for the sixth floor. This floor is similar enough; new calculations were not provided. The building plans examiner has indicated no changes are being performed on the atrium. The occupancy and use group are to remain the same. FIR16-00102 is attached to BLD15-04191
(ST. LUKE'S)(MK PLAZA I - ENTIRE BUILDING) Remodel to entire high-rise building including basement and all 6 floors for new office tenant with some assembly uses per approved plans. Work to include demolition of existing tenant spaces on all floors and build back of new spaces on all floors to include new interior walls, doors, interior finish, new suspended ceilings, electrical work, mechanical work, plumbing work and fire protection equipment. Occupant load request for classrooms on 5th floor approved and attached to case. NOTE: This building is fully fire sprinklered for high-rise and atrium provisions. A smoke management system exists for the atrium.
|