INSP-Final Inspection | 6/13/2016 | 6/14/2016 | 6/14/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Final Inspection | 6/13/2016 | 6/14/2016 | 6/13/2016 | A | CANC |
Jim Page
|
|
|
Please call Jake when you are heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PASS |
Jim Page
|
|
|
200 psi hydrostatic test for overhead fire sprinkler piping complete. Rough in inspection for shell protection complete, end of line sway bracing was not installed at time of inspection, end of line sway bracing install will be verified at final fire sprinkler inspection.
|
INSP-Sprinkler Rough-in/Hydro | 4/26/2016 | 4/28/2016 | 4/28/2016 | P | CANC |
Jim Page
|
|
|
Call Jake when you are heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 4/20/2016 | 4/26/2016 | 4/26/2016 | P | CANC |
Jim Page
|
|
|
Please call Jake when you are heading out. Thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|