INSP-Final Inspection | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | PASS |
Jim Page
|
|
|
Previously noted items have been repaired, 200 psi hydrostatic test for overhead fire sprinklers piping is complete. Final fire sprinkler inspection passed/complete.
|
INSP-Final Inspection | 8/15/2016 | 8/17/2016 | 8/17/2016 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for a final yet. Need hydro test, need siesmic bracing at the top of riser, need coverage in the combustible concealed space, need upright uncovered in the server room, possibly need additional head in the Server room
|
INSP-Sprinkler Rough-in | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations marked "ok" where piping is ok to cover.
|
INSP-Sprinkler Rough-in | 6/6/2016 | 6/7/2016 | 6/7/2016 | A | CANC |
Troy Cobbley
|
|
|
Paul Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/1/2016 | 6/2/2016 | 6/2/2016 | P | CANC |
Troy Cobbley
|
|
|
Need plan modifications as previously requested
|
INSP-Sprinkler Rough-in | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | FAIL |
Troy Cobbley
|
|
|
No city approved plans or small documents on site. I noted several areas that lack sprinkler coverage. Also additional fittings have been added which could affect the remote area. Plan review needs to provide approval of the revised plans/calculations.
|