INSP-Final Inspection | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | CANC |
Troy Cobbley
|
|
|
Wrong inspection type scheduled
|
INSP-Sprinkler Rough-in/Hydro | 8/16/2016 | 8/17/2016 | 8/17/2016 | P | CANC |
Troy Cobbley
|
|
|
Wrong inspection type scheduled
|
INSP-Final Inspection | 8/15/2016 | 8/16/2016 | 8/16/2016 | P | FAIL |
Troy Cobbley
|
|
|
Need approved drawings addressing the wireless dialer instead of two phone lines, need document box, need map at facp, need to test the duct smoke detectors, need nfpa 72s
|