Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberFIR16-00244
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 481 W GOWEN RD
Project NameBoise School Dist. Main Bldg
Customer Number 
ePlanReviewYes
Description
[Boise School District Operations and Maintenance Building]
The fire sprinkler scope of work consists of protecting a new building with a wet and dry system utilizing new 8”x30’± C-900 underground piping. A new NFPA 20, 1500 Gpm @ 62 Psi fire pump will be installed in a dedicated fire pump room. The metal building is primarily one level, which is divided into individual sections and occupancies (Somewhat similar to a strip mall in its design.) There is an extensive mezzanine system and an 11000 ft^2 office area. The sprinkler system is designed primarily as OH 2, however, there is a warehouse area utilizing ESFR sprinklers based on Group A plastics. There are several thousand gallons of various hazardous materials all below MAQ. There are also two outside double wall underground storage tanks (gasoline, diesel)

(BOISE SCHOOL DISTRICT OPERATIONS & MAINTENANCE BUILDING – Building “A”) Permit to include construction of a 50,564 square foot building primarily used as office area and a vehicle repair shop. PLAN MODIFICATION 2-23-15 – Modification submitted to value engineer the mechanical system and related work. **TLW** This building is fire sprinklered for area increases. Work to include: concrete foundation, typical metal building structural frame, interior partitions to create several offices, several separate warehouses, 7 separate mezzanines each under 3,000 square feet and each for separate “tenants” within the overall building, new plumbing, new mechanical, new electrical, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/14/201612/15/201612/15/2016APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete.
INSP-Sprinkler Rough-in11/30/201612/6/201612/7/2016PDONE
DetailsJim Page
Fire pump testing complete
INSP-Sprinkler Rough-in11/16/201611/17/201611/17/2016APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping complete, noted city approved drawings with red ink area's approved for cover.
INSP-Sprinkler Rough-in11/9/201611/10/201611/10/2016PPASS
DetailsTroy Cobbley
See the city approved plans for Office area where piping is approved for cover. I noted two areas with wood located above the ceiling that will need to be addressed prior to a final sign off.
INSP-Sprinkler Rough-in/Hydro9/30/201610/4/201610/4/2016PPASS
DetailsJim Page
24hr air test for dry system complete.
INSP-Sprinkler Rough-in/Hydro9/30/201610/3/201610/3/2016APART
DetailsJim Page
200psi hydrostatic test for all overhead fire sprinkler systems associated with this permit complete. 24 hour air test started at 11:00 am @ 40psi.