INSP-Final Inspection | 6/8/2016 | 6/10/2016 | 6/10/2016 | A | PASS |
Jim Page
|
|
|
Final inspection for basement wet system and loading dock dry system complete.
|
INSP-Sprinkler Rough-in/Hydro | 5/25/2016 | 5/25/2016 | 5/25/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in basement level complete, basement level approved for cover. 200 psi hydrostatic test complete for basement level.
|
INSP-Sprinkler Rough-in/Hydro | 5/17/2016 | 5/17/2016 | 5/17/2016 | A | PART |
Jim Page
|
|
|
24 hour air test for dry sustem located in the basement level garage area passed/complete.
|
INSP-Sprinkler Rough-in/Hydro | 5/12/2016 | 5/12/2016 | 5/12/2016 | P | PART |
Jim Page
|
|
|
24 hour air test on dry system located in lower level garage started at 1:00pm @ 43 psi.
|