INSP-Final Inspection | 4/13/2018 | 4/13/2018 | 4/13/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection per scope of work complete.
|
INSP-Final Inspection | 10/20/2017 | 10/20/2017 | 10/20/2017 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work passed/complete.
|
INSP-Sprinkler Rough-in | 8/1/2016 | 8/1/2016 | 8/1/2016 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for additional area where sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | PASS |
Troy Cobbley
|
|
|
Work for phase 1 complete. Will need as-builts showing pipe routing changes as per discussion.
|