Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberFIR16-00289
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 7488 N GARDNER LN
Project NameGARDNER DUPLEX
Customer Number 
ePlanReviewYes
Description
[Gardner Duplex]
The fire sprinkler scope of work consists of a duplex dwelling with a complete NFPA 13D sprinkler system. The water supply is from a well. CPVC piping and residential sprinklers are being utilized.

Plan Mod #1 - Changed from a tank and pump to the supply being totally from the well.
Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.
Permit for the construction of a new 2082 sq. ft. duplex. Unit A is 1035 sq. ft. with 2 bedrooms, 2 bathrooms, approximately 264 sq. ft. of covered patio/porch and 352 sq. ft. attached garage. Unit B is 1047 sq. ft. with 2 bedrooms, 2 bathrooms, approximately 202 sq. ft. of covered patio/porch and 358 sq. ft. attached garage. Also each unit has a detached garage totally 1344 sq. ft. All work per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. **DAF**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/23/201611/28/201611/28/2016APASS
DetailsKatie Marron
System tested satisfactory. Scope of work complete. Permit Finaled
INSP-Final Inspection11/22/201611/23/201611/23/2016ACANC
DetailsKatie Marron
During pretest it was found Bell is wired wrong. Will be rescheduled.
INSP-Final Inspection11/10/201611/14/201611/14/2016PCANC
DetailsTroy Cobbley
Call Anthony before heading out to confirm a time, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Final Inspection11/9/201611/10/201611/10/2016PCANC
DetailsKatie Marron
Please call Anthony before you head out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Final Inspection11/2/201611/4/201611/4/2016PCANC
DetailsKatie Marron
Call Anthony before you head out, thank you! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Sprinkler Rough-in9/13/20169/13/20169/13/2016PDONE
DetailsKatie Marron
Tenting inspection. At time of inspection, tenting completed satisfactory.
INSP-Sprinkler Rough-in/Hydro9/6/20169/6/20169/6/2016PPASS
DetailsKatie Marron
Hydrostatic re-test passed satisfactorily
INSP-Sprinkler Rough-in/Hydro9/1/20169/2/20169/2/2016PFAIL
DetailsKatie Marron
Roughin completed satisfactory.
Hydrostatic test failed.
INSP-Sprinkler Rough-in/Hydro8/31/20169/1/20169/1/2016PFAIL
DetailsJim Page
Contractor did not have overhead fire protection piping ready for hydrostatic test, hydro will need to be rescheduled for overhead fire sprinkler piping.