INSP-Final Inspection | 2/28/2018 | 3/1/2018 | 3/1/2018 | P | CANC |
Jim Page
|
|
|
Call prior to going Phone #: 2089411846 >> Inspection requested via mobile web by SVC Brian A
|
INSP-Final Inspection | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection complete.
|
INSP-Final Inspection | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | CANC |
Jim Page
|
|
|
As late as possible Phone #: 2089411846 >> Inspection requested via mobile web by SVC Brian A Inspection cancelled via mobile web on Wednesday, February 28, 2018.
|
INSP-Alarm Testing | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | DONE |
Jim Page
|
|
|
Fire alarm testing for levels 3 and 4 complete.
|
INSP-Alarm Testing | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | DONE |
Jim Page
|
|
|
Fire alarm testing for stairwell number 2 pressurization complete.
|
INSP-Alarm Testing | 1/29/2018 | 1/29/2018 | 1/29/2018 | P | DONE |
Jim Page
|
|
|
Fire alarm testing complete for level 1 lobby and level 2 common areas. Additional notification needed for level 1.5 southside of garage.
|
INSP-Alarm Testing | 1/26/2018 | 1/26/2018 | 1/26/2018 | P | PART |
Jim Page
|
|
|
Fire alarm testing for levels 5 and 6 complete.
|
INSP-Alarm Testing | 1/23/2018 | 1/23/2018 | 1/23/2018 | P | DONE |
Jim Page
|
|
|
More fire alarm testing needs to happen on level 6 before TCO
|
INSP-Alarm Testing | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | DONE |
Jim Page
|
|
|
Fire alarm inspection/testing for level 7 complete.
|
INSP-Alarm Testing | 1/9/2018 | 1/16/2018 | 1/16/2018 | A | CANC |
Jim Page
|
|
|
Call prior to going Phone #: 2089411846 >> Inspection requested via mobile web by SVC Brian A Inspection cancelled via mobile web on Tuesday, January 16, 2018.
|
INSP-Alarm Testing | 9/18/2017 | 9/20/2017 | 9/20/2017 | A | PART |
Jim Page
|
|
|
Fire alarm testing complete for fire pump riser room/fire pump room dry systems (Parking levels 1 and 2 dry systems). All tampers and flow switches in fire pump room complete, fire pump monitoring complete, tampers and flows complete for levels 1 and 2 wet systems.
|
INSP-Alarm Testing | 9/14/2017 | 9/14/2017 | 9/14/2017 | P | DONE |
Troy Cobbley
|
|
|
Today I verified the panel, batteries, phone lines, phone line troubles, battery troubles and smoke detector over the panel. Most other devices have not been connected to the main fire alarm panel. I was unable to test the hood suppression system and a/v's in the Pizza tenant due to the approved plans for the space not being on site. I also pointed out the a plan modification is needed for the new devices (fire pump) and deletion of devices. Also a plan modification is needed for stair shaft pressurization as noted on the city approved fire alarm plans.
|