Permit Information
Permit NumberFIR16-00446
StatusFinaled
Name TASKER ELECTRICAL CONSTRUCTION INC
Site Address 2967 W CRESCENT RIM DR
Project NameCrescent Rim #4
Customer Number 
ePlanReviewYes
Description
Extend the existing FA system into Bldg #4 utilizing a new SLC loop card. Original FA design was from 2008. Associated with building permit BLD06-02324.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/30/201710/31/201710/31/2017APASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection10/25/201710/27/201710/27/2017ACANC
DetailsTroy Cobbley
Bob Thorton will be the site contact. Phone #: ###-#### Inspection requested via web by Stacie Tasker
INSP-Final Inspection10/25/201710/26/201710/26/2017AFAIL
DetailsTroy Cobbley
Not ready for final yet but we did test two of the three fire smoke dampers and the dry pipe system interconnects. Still waiting on plan modifications, elevator and fire doors.
INSP-Alarm Testing10/25/201710/25/201710/25/2017PDONE
DetailsTroy Cobbley
See the on site as-builts for devices marked "ok" that have been tested.
INSP-Alarm Testing10/18/201710/19/201710/19/2017ADONE
DetailsTroy Cobbley
For todays inspection I witnessed the corrections for the notification devices and verified sync. and that all notification devices were functional. No initiating devices have been tested. Not all access has been provided for the fire/smoke dampers and not all of the fire sprinkler devices have been connected and pre-tested yet.
INSP-Alarm Testing10/17/201710/18/201710/18/2017PDONE
DetailsTroy Cobbley
We set off the alarms and it mistakenly set off the alarms and shunted the elevator in the ajoining building. Testing was stopped and agreed to reschedule for tomorrow morning.

Phone #: ###-#### Inspection requested via web by Stacie Tasker
INSP-Final Inspection10/17/201710/17/201710/17/2017PFAIL
DetailsTroy Cobbley
Todays inspection was an initial walk through. I noted that there are two missing horn/strobes in the basement (and a room), one strobe in the basement has been set at 110cd instead of 75cd as shown on the plans, first floor horn/strobes in the south building are incorrectly set at 75cd instead of 15cd, the south building second floor horn/strobe is located too far from the end of the corridor, not all of the fire/smoke dampers have been provided access for verification of correct closure, none of the elevator fire doors are installed, need map, basement manual pull station is mounted too high. We set off the horn, strobes and found that nothing is sync'ing as required by NFPA 72. As-builts are needed showing the changes and will need to be approved by the engineer of record. No actual testing of devices was performed at this time.

Greg Phone #: ###-####