INSP-Final Inspection | 10/12/2016 | 10/12/2016 | 10/12/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete.
|
INSP-Final Inspection | 8/9/2016 | 8/9/2016 | 8/9/2016 | P | CANC |
Jim Page
|
|
|
Scope of work overhead fire sprinkler piping not ready for final inspection. Overhead fire sprinkler final inspection will need to be accomplished close to the finish stage of tenant space.
|
INSP-Sprinkler Rough-in | 8/9/2016 | 8/9/2016 | 8/9/2016 | P | CANC |
Jim Page
|
|
|
Rough to cover inspection completed, this inspection request cancelled.
|
INSP-Final Inspection | 8/8/2016 | 8/9/2016 | 8/9/2016 | A | CANC |
Jim Page
|
|
|
Scope of work overhead fire sprinkler piping not ready for final inspection. Overhead fire sprinkler final inspection will need to be accomplished close to the finish stage of tenant space.
|
INSP-Sprinkler Rough-in | 8/8/2016 | 8/9/2016 | 8/9/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for scope of work complete for overhead fire sprinkler piping, scope of work overhead fire sprinkler piping approved for cover
|