INSP-Final Inspection | 12/2/2016 | 12/2/2016 | 12/2/2016 | A | PASS |
Jim Page
|
|
|
Final underground inspection passed/complete
|
INSP-Supply line flush | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | DONE |
Jim Page
|
|
|
Underground supply line flush complete
|
INSP-Sprinkler Rough-in/Hydro | 11/18/2016 | 11/18/2016 | 11/18/2016 | P | PASS |
Jim Page
|
|
|
Underground hydrostatic test complete
|
INSP-Sprinkler Rough-in | 10/21/2016 | 10/24/2016 | 10/24/2016 | A | CANC |
Jim Page
|
|
|
This FIR permit is for underground supply, inspection request is for rough in inspection for overhead fire sprinkler piping (FIR16-00534). This inspection request is cancelled and the correct permit has been shceduled.
|
INSP-Sprinkler Rough-in | 9/2/2016 | 9/6/2016 | 9/6/2016 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground main supply complete, underground main supply approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 7/28/2016 | 7/29/2016 | 7/29/2016 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection complete for underground supply, underground approved for cover from the water supply to the PIV, after the PIV until the change of direction going to the building. Entire supply will be covered for equipment ramp and the remaining underground supply will be excavated and installed at later date.
|