INSP-Final Inspection | 1/4/2017 | 1/5/2017 | 1/5/2017 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Final Inspection | 1/3/2017 | 1/4/2017 | 1/4/2017 | P | CANC |
Jim Page
|
|
|
Inspection request rescheduled due to scheduling conflict.
|
INSP-Sprinkler Rough-in/Hydro | 12/27/2016 | 12/28/2016 | 12/28/2016 | A | PASS |
Jim Page
|
|
|
Hydrostatic test complete for overhead fire sprinkler piping.
|
INSP-Sprinkler Rough-in/Hydro | 12/14/2016 | 12/14/2016 | 12/14/2016 | P | PASS |
Jim Page
|
|
|
Underground supply hydro test complete
|
INSP-Supply line flush | 12/14/2016 | 12/14/2016 | 12/14/2016 | P | CANC |
Jim Page
|
|
|
Inspection request is for underground hydro, this inspection request cancelled the proper inspection request will be generated.
|
INSP-Supply line flush | 12/7/2016 | 12/9/2016 | 12/9/2016 | A | DONE |
Jim Page
|
|
|
Supply line flush complete
|
INSP-Supply line flush | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | CANC |
Jim Page
|
|
|
Supply line flush was suppose to be scheduled for 09DEC2016, this request cancelled
|
INSP-Supply line flush | 11/21/2016 | 11/22/2016 | 11/22/2016 | P | PASS |
Jim Page
|
|
|
Inspection request was for a rough to cover inspection for the underground supply, not a supply line flush, underground supply approved for cover.
|