Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberFIR16-00535
StatusFinaled
Name AMERICAN FIRE PROTECTION LLC
Site Address 833 W DIAMOND ST
Project NameECCO Expansion
Customer Number 
ePlanReviewYes
Description
[ECCO Expansion]
The fire sprinkler scope of work consists of ESFR system in new 41,848 sq ft warehouse expansion for storage of raw and finished goods. System will have a 1000 Gpm @ 90 Psi, 75 HP electric fire pump. The system is designed as a 6”x4”x3” grid.

Location on Plan - Warehouse
Commodity - Plastics
Classification - Group A Plastics
Storage Type (rack, solid pile, etc.) - Racks
Pallet Type (wood or plastic) - Wood and Plastic
Aisle Width - 6’-8”
Height of Storage - 28’
Ceiling Height - 30’
Encapsulated - No
Solid Shelves - No ????
Smoke and Heat Vents - No
Draft Curtain - No
In Rack Sprinklers - No
Sprinkler Type - ESFR K=25.2
High Temperature Sprinklers Required - No
Applicable NFPA Section - T 17.3.3.1
Hydraulic Design Criterion - 20 Psi, (12) Sprk – (4) per row
Hose Stream Requirements - 250

? There will be wood pallet storage less than 5’ per 606 form.
? There will be plastic pallet storage less than 5’ per 606 form.


[BLD16-02075] - Permit for the construction of a 41,021 sq. ft. prefabricated Butler steel building addition to an existing 49,563 sq. ft. type VB building with work to include site grading and drainage and site utilities as well as general site improvements. All work per the approved plans and the attached engineering. This building will be fully fire sprinklered for unlimited area. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/4/20171/5/20171/5/2017APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Final Inspection1/3/20171/4/20171/4/2017PCANC
DetailsJim Page
Inspection request rescheduled due to scheduling conflict.
INSP-Sprinkler Rough-in/Hydro12/27/201612/28/201612/28/2016APASS
DetailsJim Page
Hydrostatic test complete for overhead fire sprinkler piping.
INSP-Sprinkler Rough-in/Hydro12/14/201612/14/201612/14/2016PPASS
DetailsJim Page
Underground supply hydro test complete
INSP-Supply line flush12/14/201612/14/201612/14/2016PCANC
DetailsJim Page
Inspection request is for underground hydro, this inspection request cancelled the proper inspection request will be generated.
INSP-Supply line flush12/7/201612/9/201612/9/2016ADONE
DetailsJim Page
Supply line flush complete
INSP-Supply line flush12/6/201612/7/201612/7/2016ACANC
DetailsJim Page
Supply line flush was suppose to be scheduled for 09DEC2016, this request cancelled
INSP-Supply line flush11/21/201611/22/201611/22/2016PPASS
DetailsJim Page
Inspection request was for a rough to cover inspection for the underground supply, not a supply line flush, underground supply approved for cover.